By working in close partnership with GBF, we were able to standardise their refuelling package, streamline installation processes, and ensure consistent quality across all manufacturers. This collaboration not only reduced costs and eliminated commissioning issues but also led to the development of a standard product for broader applications.

Andrew Olive

Technical and Projects DirectorHytek

The Client's Challenge

The need for consistency

In an effort to increase market penetration with their unique HVO products, GBF introduced a refuelling package that included pumps, fuel management systems, gauging, and gauge interfaces. However, the tank manufacturers working with GBF encountered several challenges:

  • They lacked experience in connecting the various components, leading to inconsistencies in the build quality of the tank packages.
  • The use of non-standard equipment from different manufacturers made it difficult to ensure uniformity.
  • These inconsistencies resulted in an increased number of commissioning visits, adding time and cost to the process.

The Solution

A comprehensive approach

Hytek’s Project Team stepped in to address these issues and developed a comprehensive solution. Here’s how we tackled the challenges:

  • Fuel Management Package Redesign: We redeveloped the fuel management package. We integrated the O.L.E. gauge and interface board within a single housing. Therefore, this reduced the number of connections required when installing the system in the tank cabinet, simplifying the process.
  • Standardised Pump Models: By collaborating with the various tank manufacturers, we were able to standardise the range of pumps to just two models. Thereby making installation more consistent.
  • Clear Installation Guidelines: We created standard installation instructions and wiring diagrams, providing a clear and consistent process for all manufacturers to follow.
  • Electrical Testing Protocols: To ensure quality and reliability, we developed standard electrical test processes. These processes confirmed the proper connectivity of the pump, fuel management system, and gauge before the tanks were dispatched.

The Results

Significant business improvements

The implementation of these solutions delivered significant improvements:

  • Standardisation: We successfully standardised the pump and fuel management systems for each size of tank package, leading to more uniform builds across different manufacturers.
  • Cost Reduction: The simplified and standardised installation process resulted in reduced installation costs.
  • Consistent Quality: We provided a consistent standard of manufacture and installation. Therfore ensuring each tank met the same high-quality benchmarks.
  • Fewer Commissioning Issues: By implementing standard testing procedures, we eliminated the commissioning issues that had previously plagued the process.
  • FC20i Product Development: As a result of this successful project, we created the FC20i standard product, which is now being used in other applications.

If you’d like to discuss how our team can help your business, then just get in touch here.

Interested In Starting A Project?

Talk To Our Experts Today

If you have a project that you'd like to discuss with us, our team are ready and waiting to speak with you.